A new build is the one project where the walls haven’t been decided yet. That makes it the cheapest point to move a power point, widen a joinery recess or rethink a ceiling. This guide covers when to bring in interior design, what to look for on the plans, and which selections to lock in before construction starts.
SECTION N–N | LEVEL: FLOOR TO WALL | HALLWAY, STAIR AND GLAZING | REFERENCE IMAGE
01 PLANS
When to start and what to check before sign-off.
02 JOINERY
Recesses, services and built-in storage.
03 LIGHTING
Wiring positions before the ceilings close.
04 FINISHES
Seeing and documenting selections for the builder.
LEVEL — PLAN
The short answer is while the plans can still change. Architects and building designers set the structure, the openings and the room sizes. Interior design tests how those rooms will actually be lived in: where the sofa goes, whether the island leaves room to walk past an open dishwasher, and whether a bedroom has a wall long enough for a wardrobe.
Once the slab is poured and the frame is up, each of those questions turns into a variation. On paper, they cost a redraw.
Furniture drawn to scale in every living and bedroom, not just labelled.
Door swings and window positions against beds, desks and joinery walls.
Circulation around kitchen benches, stairs and the main entry.
Where plumbing and electrical services sit relative to future cabinetry.
Our New Build Interior Design service starts at this stage, working from the plans alongside Space Planning.
LEVEL — BENCH TO CEILING
BENCH — JOINERY
Built-in wardrobes, laundry cabinetry and living-room units work best when the recess, bulkhead and power are planned for them. Decide early where integrated appliances, concealed rangehoods and joinery lighting go, so the frame and wiring suit. See Custom Joinery Design and Kitchen Design.
CEILING — LIGHTING
A standard electrical plan often puts downlights on a grid. Plan the light around the furniture instead: pendants centred over the island and dining table, wall lights beside the bed, and dimmable circuits for living areas. Moving a cable later means cutting plasterboard. More in Lighting & Finishes.
FLOOR TO WALL — FINISHES
Flooring thickness affects door heights and thresholds. Tile sizes affect set-out and falls. Stone benchtops need measured cabinetry. Choosing flooring, tiles, benchtops and paint as one palette through Colour & Material Selection keeps the builder’s orders consistent.
LEVEL — DRAWING SET
Plans and sample boards are hard to picture at full scale. 3D Interior Visualisation shows the kitchen, the stair void or the main bedroom before anything is ordered, so proportions, sightlines and material pairings can be tested while changes are still free.
Approved decisions then need to reach site intact. Design Documentation turns them into joinery drawings, lighting and electrical layouts and finishes schedules that builders and trades can price and build from, which leaves less to interpret on site.
LEVEL: PLAN | HAND-DRAWN LAYOUT | REFERENCE IMAGE
LEVEL — NEXT
01 Furniture laid out to scale in every room
02 Joinery recesses and services agreed
03 Lighting planned around furniture, not a grid
04 Flooring, tiles and benchtops chosen as one palette
05 Drawings and schedules ready for the builder